Skip to content
Book a Demo

Identify BMS Commissioning Issues

Robin can navigate most BMS systems, so it can perform basic diagnostics and verify whether a system performance matches what is expected based on the SOO. Try a prompt like what is below with Tridium or another BAS/BMS and Robin will navigate to the correct page and pull the data you want.

Review the VAVs on [Your Floor/Space] and identify which have Space temperatures that are 2 degrees or more above the Setpoint temperatures. Give me a CSV report of all of the VAVs that have temperature issues.